Weir (Thomson Weir / V notch sharp crested weir)
Jump to navigation
Jump to search
Parameter to be measured:
Discharge of open channels
Method:
Equipment:
Construction:
1. Planning: Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germanyneeded permissions of following people: 1. Owner
Advantages:
Disadvantages:
What to watch out for:
Problems/Questions:
Links
Projects that used the above equipment:
Other related web sites: